Roberts Construction

Organized for Performance - Commited to Service


Home :: Login
Main Site :: Album list :: Last uploads :: Last comments :: Most viewed :: Top rated :: My Favorites :: Search

Home > Pre-Engineered

Aaron's of Richmond


Aaron_s,_Richmond-front.jpg

This 8,000 square foot facility was constructed under design-build contract. The retail center was constructed utilizing a pre-engineered metal building system on a concrete slab on grade with a metal wall panel and exterior insulated finish system façade.

3 files, last one added on Dec 03, 2008

Backwaters


Backwaters-front.JPG

This 8,000 square foot retail center was built on a concrete slab on grade utilizing a pre-engineered metal building for the primary structure. A standing seam metal roof and rustic log siding were used for the exterior finishes.

5 files, last one added on Dec 03, 2008

Dal-R's


Dal-R_s_1.JPG

This project of approximately 16,000 square feet was constructed utilizing a pre-engineered metal building on a poured concrete floor slab. The project featured some 4,000 square feet of show room and offices and approximately 12,000 feet of warehouse space to service the needs of this retail client.

3 files, last one added on Dec 03, 2008

Dollar Generals - 9 sites IN, OH & KY


Fayetteville_DG.jpg

These nine approximately 8,000 square foot retail stores were built utilizing a pre-engineered metal building on a concrete slab on grade. Very aggressive time frames for construction were met in order to get the stores open for business.

3 files, last one added on Dec 03, 2008

East Somerset Baptist Church


ESBC-int_7.JPG

Roberts Construction has worked with the church on three separate projects. In Phase I Roberts acted as construction manager to build an approximately 27,000 square foot 1100 seat sanctuary addition connecting to their existing facility. On Phase II Roberts provided design and construction management services for the renovation and reconfiguration of existing facility space into a new Youth Chapel, Sunday school classrooms, and offices and other ancillary space. Design services for Phase III have been provided which will include an expansion of the church’s existing Family Life Center and an expansion to educational spaces.

10 files, last one added on Dec 03, 2008

Independent Opportunities


Ind__Opp__1.jpg

This approximately 10,000 square foot adult day care facility utilized a pre-engineered metal building structure with a standing seam metal roof with a simulated stucco and stone veneer façade. The facility features interior and exterior patient care spaces as well as administrative office and other ancillary space for the operation of the facility.

4 files, last one added on Dec 03, 2008

Mattingly Center


Mattingly_ext_3.JPG

This 12,000 square foot retail center was constructed utilizing a pre-engineered metal building system with a simulated stone and exterior insulated finish system façade. The project features an 8,000 square foot space for an Aaron’s Rents retail center as well as 4,000 square feet of future retail/office space.

4 files, last one added on Dec 03, 2008

McCreary Spec


Areial_photo_of_McCreary_Co__Speculative_Building.jpg

This project consists of the construction of site development of approximately ten acres with the entire necessary utility infrastructure as well as the construction of an approximately 32,500 square foot pre-engineered metal building with a split face block wainscot and metal wall panel veneer.

2 files, last one added on Dec 03, 2008

Somerset Recycling


Somerset_Recycle_1.JPG

This total project consisted of three buildings totaling approximately 60,000 square feet. Roberts Construction arranged for the architectural design of the main building which consisted of a 56,000 square feet pre-engineered metal building on a concrete slab. This contract included the total electrical system for the recycling equipment and lighting. Interior finishes for the office space were also included in the design and construction of the project.

2 files, last one added on Dec 03, 2008

KY Regional High Growth


174_2009_03_03_[2].JPG

This 26,250 square foot pre-engineered metal building with 46 foot walls is located in Somerset, KY and used as a lineman training facility.

6 files, last one added on Mar 04, 2009

 

 

10 albums on 1 page(s)